Work Day 16-The walls have been properly reinforced with rebar and are ready to pour with concrete. Window and door bucks are used in all openings to keep them square and provide for easy installation of doors and windows. The scaffolding allows us to plumb and line the walls as well as provide a working platform. |
|
The walls are poured using a boom pump.
The job was complete in about 4 hours. |
|
 |
|
 |
|
Metal electrical boxes are cut into the foam. The wire is laid directly against the concrete and held in place with expansion foam. |
|
| Sheetrock is attached to the interior walls by screwing to the black plastic strips, which are set 8 inches on center. |
|
 |
|
|